Zweckverband Personennahverkehr Saarland Germany
Vergabe von Leistungen für ein digitales SEV-Leitsystem Saarland: Beschaffung und Aufstellung von Haltestellenmasten - Beschaffung von ePaper-Displays - Beschaffung einer Hintergrundsoftware
Lot 1
Lieferung und Aufstellung von Haltestellenmasten
LOT-0001
Ask first
Next: check the requirement named below against your own records.
Not read in full, or a question left open.
Only the firm can judge whether its references and staff fit what the buyer names, or how much of its turnover is in the contract's field.
Compared with the demo firm, Brink Data B.V.
Decided by code from the figures compared; the model only read the clauses.
The clause that decides
General yearly turnover
slc-stand-to-gen Criterion 2 of 10
Not settled by the profile
German
Quoted from TED notice 711197-2026
Mindestumsatz von 300.000 EUR jährlich in den letzten 3 Geschäftsjahren. Eigenerklärung über den durchschnittlichen Umsatz im Tätigkeitsbereich des Auftrags in den letzten 3 Geschäftsjahren (gerechnet ab dem 01.01.2023).
AI readingThe bidder must have achieved a minimum annual turnover of 300,000 EUR over each of the last three financial years.
Read by the model. Code found each quote shown here word for word in this clause. Open notice on TED
Other requirements in this lot (9)
Enrolment in a trade register
slc-suit-reg-trade Criterion 1 of 10
Not assessed
German
Quoted from TED notice 711197-2026
Eigenerklärung im Rahmen der EEE
Read by the model, which named no requirement in this clause. Open notice on TED
Professional risk indemnity insurance
slc-stand-ins Criterion 3 of 10
Not compared in this version
German
Quoted from TED notice 711197-2026
Siehe Teilnahmebedingungen, Ziffer 8, Abs (4) b)
Read by the model, which named no requirement in this clause. Open notice on TED
Technicians or technical bodies for quality control
slc-abil-staff-tech-ctrl Criterion 4 of 10
Not settled by the profile
German
Quoted from TED notice 711197-2026
Beschreibung im Rahmen der EEE
Read by the model, which named no requirement in this clause. Open notice on TED
Technicians or technical bodies to carry out the work
slc-abil-staff-tech-work Criterion 5 of 10
Not settled by the profile
German
Quoted from TED notice 711197-2026
Angaben im Rahmen der EEE
Read by the model, which named no requirement in this clause. Open notice on TED
Relevant educational and professional qualifications
slc-abil-staff-qual Criterion 6 of 10
Not settled by the profile
German
Quoted from TED notice 711197-2026
Beschreibung im Rahmen der EEE
Read by the model, which named no requirement in this clause. Open notice on TED
Subcontracting proportion
slc-abil-subc Criterion 7 of 10
Not compared in this version
German
Quoted from TED notice 711197-2026
Angaben im Rahmen der EEE
Read by the model, which named no requirement in this clause. Open notice on TED
Samples, descriptions, or photographs without certification of authenticity
slc-abil-qual-smp-wo-autent Criterion 8 of 10
Not compared in this version
German
Quoted from TED notice 711197-2026
Beschreibung im Rahmen der EEE
Read by the model, which named no requirement in this clause. Open notice on TED
Other economic or financial requirements
slc-stand-other Criterion 9 of 10
Not compared in this version
German
Quoted from TED notice 711197-2026
Angaben zur 'Gründung des Wirtschaftsteilnehmers' im Rahmen der EEE
Read by the model, which named no requirement in this clause. Open notice on TED
References on specified works
slc-abil-ref-work Criterion 10 of 10
Not settled by the profile
- Maximum number of tenders passing: 5
German
Quoted from TED notice 711197-2026
Beschreibung im Rahmen der EEE sowie In Anlage TNW_1_Teilnahmeformular Siehe Teilnahmebedingungen Ziffer 9 Absatz (2), Los 1
Read by the model, which named no requirement in this clause. Open notice on TED
- Deadline
- Requests to participate
- Estimated value
- Value not published
- Selection criteria
- 10
- Criteria source
- In the notice and in the ESPD
- Legal basis
- Directive 2014/24/EU vgv, Verhandlungsverfahren mit Teilnahmewettbewerb gemäß § 17 VgVCrossBorderLaw, Es handelt sich hier nicht um grenzüberschreitende Verkehrsleistungen.
Note on this lot
#Besonders auch geeignet für:other-sme#
What was read and what was not
- Read: 10 selection criteria published in the notice for this lot.
- Not read: the ESPD, which the buyer names as a source of criteria.
- Not read: the documents a criterion refers to.
- Not assessed: exclusion grounds, registration or authorisation, declarations the notice demands, and the buyer's shortlisting.
Lot 2
Beschaffung und Montage von ePaper-Displays
LOT-0002
Ask first
Next: check the requirement named below against your own records.
Not read in full, or a question left open.
Only the firm can judge whether its references and staff fit what the buyer names, or how much of its turnover is in the contract's field.
Compared with the demo firm, Brink Data B.V.
Decided by code from the figures compared; the model only read the clauses.
The clause that decides
General yearly turnover
slc-stand-to-gen Criterion 2 of 10
Not settled by the profile
German
Quoted from TED notice 711197-2026
Mindestumsatz von 300.000 EUR jährlich in den letzten 3 Geschäftsjahren. Eigenerklärung über den durchschnittlichen Umsatz im Tätigkeitsbereich des Auftrags in den letzten 3 Geschäftsjahren (gerechnet ab dem 01.01.2023).
AI readingThe bidder must have had a minimum annual turnover of 300,000 EUR in each year over the last three financial years.
Read by the model. Code found each quote shown here word for word in this clause. Open notice on TED
Other requirements in this lot (9)
Enrolment in a trade register
slc-suit-reg-trade Criterion 1 of 10
Not assessed
German
Quoted from TED notice 711197-2026
Eigenerklärung im Rahmen der EEE
Read by the model, which named no requirement in this clause. Open notice on TED
Technicians or technical bodies for quality control
slc-abil-staff-tech-ctrl Criterion 3 of 10
Not settled by the profile
German
Quoted from TED notice 711197-2026
Beschreibung im Rahmen der EEE
Read by the model, which named no requirement in this clause. Open notice on TED
Technicians or technical bodies to carry out the work
slc-abil-staff-tech-work Criterion 4 of 10
Not settled by the profile
German
Quoted from TED notice 711197-2026
Angaben im Rahmen der EEE
Read by the model, which named no requirement in this clause. Open notice on TED
Professional risk indemnity insurance
slc-stand-ins Criterion 5 of 10
Not compared in this version
German
Quoted from TED notice 711197-2026
Siehe Teilnahmebedingungen, Ziffer 8, Abs (4) b)
Read by the model, which named no requirement in this clause. Open notice on TED
Samples, descriptions, or photographs without certification of authenticity
slc-abil-qual-smp-wo-autent Criterion 6 of 10
Not compared in this version
German
Quoted from TED notice 711197-2026
Beschreibung im Rahmen der EEE
Read by the model, which named no requirement in this clause. Open notice on TED
Other economic or financial requirements
slc-stand-other Criterion 7 of 10
Not compared in this version
German
Quoted from TED notice 711197-2026
Angaben zur 'Gründung des Wirtschaftsteilnehmers' im Rahmen der EEE
Read by the model, which named no requirement in this clause. Open notice on TED
References on specified works
slc-abil-ref-work Criterion 8 of 10
Not settled by the profile
- Maximum number of tenders passing: 5
German
Quoted from TED notice 711197-2026
Beschreibung im Rahmen der EEE Siehe Teilnahmebedingungen Ziffer 9 Absatz (2), Los 2
Read by the model, which named no requirement in this clause. Open notice on TED
Relevant educational and professional qualifications
slc-abil-staff-qual Criterion 9 of 10
Not settled by the profile
German
Quoted from TED notice 711197-2026
Beschreibung im Rahmen der EEE
Read by the model, which named no requirement in this clause. Open notice on TED
Subcontracting proportion
slc-abil-subc Criterion 10 of 10
Not compared in this version
German
Quoted from TED notice 711197-2026
Angaben im Rahmen der EEE
Read by the model, which named no requirement in this clause. Open notice on TED
- Deadline
- Requests to participate
- Estimated value
- Value not published
- Selection criteria
- 10
- Criteria source
- In the notice and in the ESPD
- Legal basis
- Directive 2014/24/EU vgv, Verhandlungsverfahren mit Teilnahmewettbewerb gemäß § 17 VgVCrossBorderLaw, Es handelt sich hier nicht um grenzüberschreitende Verkehrsleistungen.
Note on this lot
#Besonders auch geeignet für:other-sme#
What was read and what was not
- Read: 10 selection criteria published in the notice for this lot.
- Not read: the ESPD, which the buyer names as a source of criteria.
- Not read: the documents a criterion refers to.
- Not assessed: exclusion grounds, registration or authorisation, declarations the notice demands, and the buyer's shortlisting.
Lot 3
Bereitstellung einer Hintergrundsoftware für ePaper-Displays
LOT-0003
Ask first
Next: check the requirement named below against your own records.
Not read in full, or a question left open.
Only the firm can judge whether its references and staff fit what the buyer names, or how much of its turnover is in the contract's field.
Compared with the demo firm, Brink Data B.V.
Decided by code from the figures compared; the model only read the clauses.
The clause that decides
General yearly turnover
slc-stand-to-gen Criterion 2 of 10
Not settled by the profile
German
Quoted from TED notice 711197-2026
Mindestjahresumsatz von 300.000 EUR jährlich in den letzten 3 Geschäftsjahren Eigenerklärung über den durchschnittlichen Umsatz im Tätigkeitsbereich des Auftrags in den letzten 3 Geschäftsjahren (gerechnet ab dem 01.01.2023)
AI readingThe bidder must have a minimum annual turnover of 300,000 EUR each year over the last three financial years.
Read by the model. Code found each quote shown here word for word in this clause. Open notice on TED
Other requirements in this lot (9)
Enrolment in a trade register
slc-suit-reg-trade Criterion 1 of 10
Not assessed
German
Quoted from TED notice 711197-2026
Eigenerklärung im Rahmen der EEE
Read by the model, which named no requirement in this clause. Open notice on TED
Professional risk indemnity insurance
slc-stand-ins Criterion 3 of 10
Not compared in this version
German
Quoted from TED notice 711197-2026
Siehe Teilnahmebedingungen, Ziffer 8, Abs (4) b)
Read by the model, which named no requirement in this clause. Open notice on TED
Technicians or technical bodies for quality control
slc-abil-staff-tech-ctrl Criterion 4 of 10
Not settled by the profile
German
Quoted from TED notice 711197-2026
Beschreibung im Rahmen der EEE
Read by the model, which named no requirement in this clause. Open notice on TED
Technicians or technical bodies to carry out the work
slc-abil-staff-tech-work Criterion 5 of 10
Not settled by the profile
German
Quoted from TED notice 711197-2026
Angaben im Rahmen der EEE
Read by the model, which named no requirement in this clause. Open notice on TED
Relevant educational and professional qualifications
slc-abil-staff-qual Criterion 6 of 10
Not settled by the profile
German
Quoted from TED notice 711197-2026
Beschreibung im Rahmen der EEE
Read by the model, which named no requirement in this clause. Open notice on TED
Subcontracting proportion
slc-abil-subc Criterion 7 of 10
Not compared in this version
German
Quoted from TED notice 711197-2026
Angaben im Rahmen der EEE
Read by the model, which named no requirement in this clause. Open notice on TED
Samples, descriptions, or photographs without certification of authenticity
slc-abil-qual-smp-wo-autent Criterion 8 of 10
Not compared in this version
German
Quoted from TED notice 711197-2026
Beschreibung im Rahmen der EEE
Read by the model, which named no requirement in this clause. Open notice on TED
Other economic or financial requirements
slc-stand-other Criterion 9 of 10
Not compared in this version
German
Quoted from TED notice 711197-2026
Angaben zur 'Gründung des Wirtschaftsteilnehmers' im Rahmen der EEE
Read by the model, which named no requirement in this clause. Open notice on TED
References on specified services
slc-abil-ref-services Criterion 10 of 10
Not settled by the profile
- Maximum number of tenders passing: 5
German
Quoted from TED notice 711197-2026
Beschreibung im Rahmen der EEE sowie In Anlage TNW_1_Teilnahmeformular Siehe Teilnahmebedingungen Ziffer 9 Absatz (2), Los 3
Read by the model, which named no requirement in this clause. Open notice on TED
- Deadline
- Requests to participate
- Estimated value
- Value not published
- Selection criteria
- 10
- Criteria source
- In the notice and in the ESPD
- Legal basis
- Directive 2014/24/EU vgv, Verhandlungsverfahren mit Teilnahmewettbewerb gemäß § 17 VgVCrossBorderLaw, Es handelt sich hier nicht um grenzüberschreitende Verkehrsleistungen.
Note on this lot
#Besonders auch geeignet für:other-sme#
What was read and what was not
- Read: 10 selection criteria published in the notice for this lot.
- Not read: the ESPD, which the buyer names as a source of criteria.
- Not read: the documents a criterion refers to.
- Not assessed: exclusion grounds, registration or authorisation, declarations the notice demands, and the buyer's shortlisting.
Tender pages from a web search for this buyer
Web search results, not checked
Found by a web search for the buyer's name when this snapshot was captured. The list keeps only pages that look like tender or award pages, and a page may be another buyer's. These results were not checked and do not change the verdict.
- Vergabe von Leistungen für ein digitales SEV-Leitsystem ... www.service.bund.de
- Ausschreibungen Zweckverband Personennahverkehr Saarland bidfix.ai
- Beschaffung von 8 Solo-BEV-Bussen oeffentlichevergabe.de
Documents not read yet
Sources outside the notice have not been read. The criteria shown above come from the notice alone, and those sources can add more.
Criteria as published in TED notice 711197-2026. Source: TED, the EU's Tenders Electronic Daily, snapshot captured 22 Oct 2026. Not legal advice.
About this tender
- Kind
- Software packages, CPV 48813000
Model read of this capture
- Model
- nvidia/nemotron-3-super-120b-a12b
- Provider
- Nebius Token Factory
- Region
- us-central1
- Run date
- 2026-10-22
- Input tokens
- 293,177
- Output tokens
- 208,761
- Reasoning tokens
- 0
- Cost in USD
- 0.275838
- Quotes verified
- 1,789
- Quotes rejected
- 76